Test the functions in the contract
A pre-delivery demonstration should establish whether the built system matches the approved design and performs the agreed functions. It should not become an attempt to demonstrate an undefined maximum. Identify the tank, pump, piping and controls first.
The agreed procedure should address guards, mounting, fluids, priming and safe zones before the system is energized. Individual outlets and approved combined modes need their own results. An unsafe or incomplete installation is not ready for functional testing.
What makes two spray-test results comparable?
Record the serial number, tank fill level, test water, pump speed, test duration and ambient conditions relevant to the observation. Identify the pressure gauge and flow meter if measurements are part of the acceptance plan. Specify whether the pump flow test and pump pressure test occur at the same duty point.
For the spray width test, show the active front spray, rear spray, side spray and water cannon circuits. Include nozzle inspection, spray pattern and any agreed measurement positions. A simultaneous-circuit test answers a different question from a demonstration with one outlet open.
Inspect controls and containment as well as the spray
The water truck pre-delivery inspection should address PTO engagement, valve operation, the drain valve, hose connections and visible water tank leakage. Agree a tank leak-test method with the supplier; do not infer a pressure rating from a visual water test or introduce an unapproved pressure procedure.
Keep the inspection report, video record and punch list linked to the accepted configuration. Where a suction test is required, state the source arrangement and method. Close defects with evidence, and include the operator manual and handover checklist so that the buyer knows which settings and maintenance instructions apply after shipment.
Record the setup behind the observed result
A visible discharge proves neither a measured flow nor a coverage claim. Record the operating mode, conditions, observations and measurements against the acceptance criteria agreed before the test. One functioning outlet does not establish the whole system’s condition.
Scroll horizontally to view all columns.
| Decision | What to establish | Condition or limit |
|---|---|---|
| Configuration match | Reconcile the built tank and system with the latest approved revision. | Similar component appearance is not identity evidence. |
| Static inspection | Check mounting, guards, hoses, fittings, drains, controls and labels. | Do not energize a visibly unsafe or incomplete system. |
| Functional test | Run each specified outlet and approved combined mode. | One operating outlet does not prove the whole system. |
| Release record | Record results, exceptions, corrections and approver. | Verbal closure or edited video is not a controlled release record. |
Keep corrections and approval with the test record
List each exception, the corrective work and its verification, then retain the approver and release status. Use the installed manuals and destination inspection requirements. Edited video or verbal closure cannot replace the controlled record.
Information to prepare for this review
- Latest approved specification and water-system drawing
- Vehicle and component identity
- Safe test-water source and disposal plan
- Required outlet modes and acceptance criteria
- Instrument and observation record
- Exception, correction and release authority
Records to request and keep
- Configuration and component identity reconciliation
- Static mounting, guard, hose and valve checklist
- Mode-by-mode functional and leak record
- Signed exception and release disposition
Common mistakes and what to check instead
- Testing with an empty or unprimed pump: Follow the selected pump and drive preparation instructions.
- Recording only a wide-angle video: Tie observations and any measurements to the named mode and setup.
- Leaving small leaks for site correction: Record, correct and retest the leak before release. A written concession for a separate noncritical deviation does not waive a safety or containment defect.
Buyer questions and practical limits
Is a spray video a complete acceptance test?
- It is evidence for the functions visible under the recorded conditions. Flow, pressure and coverage claims need the agreed measurements and supporting records.
When should the acceptance criteria be agreed?
- Before manufacture or at least before the test is scheduled, while the required equipment, method and remedy for failed results can still be confirmed.
Scope of this guide
This checklist does not replace the selected equipment manuals or destination inspection.
Acceptance criteria must be agreed before the test and remain project specific.
Do not test or release with unsafe pressure, exposed moving parts, uncontrolled discharge, leakage or unresolved protection faults.
Sources and applicability
Use these worksheets to prepare your requirements. Ask the supplier for documents specific to the vehicle you are ordering.
Master inspection template distinguishing critical defects from major defects and written buyer concessions. Critical safety or containment defects require correction and re-inspection. The signed order and approved inspection plan define the criteria for the actual vehicle.
Pages 2, 14 and 18: defect classes, tank-system criteria and release
Document date:
Sources checked:
Explains the steps from describing the job and comparing quotations to configuration approval and inspection.
Provides public checklists and worksheets; the signed project documents remain controlling.
Defines the relevant product family and published configuration boundaries. Project-specific ratings require the selected OEM documents.
Manufacturer primary source supporting pump, PTO, water-level, spray-control, hose, leak and pre-start checks. Its settings apply to the source model and do not establish the ratings or settings for equipment offered by KEEYAK.